<fieldset id="mwu6i"><menu id="mwu6i"></menu></fieldset>
<fieldset id="mwu6i"><menu id="mwu6i"></menu></fieldset>
  • <tfoot id="mwu6i"></tfoot>
    
    
  • <strike id="mwu6i"></strike>
    <strike id="mwu6i"></strike>
  • <fieldset id="mwu6i"><menu id="mwu6i"></menu></fieldset>
    <fieldset id="mwu6i"><menu id="mwu6i"></menu></fieldset><abbr id="mwu6i"></abbr>
    Packaging line
    Automatic unpacking, packing, box sealing and strapping line in food industry
    2017-09-23 17:18:40

    Automatic unpacking, packing, box sealing and strapping line in food industry

    One,preparation

    1.mechanical fastening parts connection is firm, the instrument and meter work is normal.

    2.gas pressure 50 ~ 110mbar, air pressure 0.5 ~ 0.55MPa.

    3.conveyor and photoelectric switch without foreign body blocking.

     

    Two,operation instructions

    1.open air and compressed air valve, close the control power supply.

    2.press the reset button on the control panel.

    3.start automatic packaging mode.

    4.roller machine, the site operation button yellow indicator light. Electric forklift fork from the unit, take down the craft tray, put down the unit to withdraw from the forklift, press the operation button 3 seconds after entering the automatic packaging operation.

    5.Each panel buttons were yellow and green two indicator: when the green light is on, indicating that can perform the function button; yellow light that is performing the function for the button.

    6.automatic operation under the F1 or F2 can immediately terminate the operation; according to the F3 must complete the current action will stop running, that is, single step operation.

    7.when the equipment appears abnormal warning lights flashing, troubleshooting, must be in the manual state, the reset operation, and then press the reset button.

    8.units through the packaging line, no need to pack, cancel the bag, the program, at this time F7, F8 lights.

     

    Three,matters needing attention

    1.operation and maintenance personnel shall be trained and qualified.

    2.daily inspection records, found that the problem report in time.

    3.do not work at run time using the manual mode.

    4.to prohibit the start of the device is not at the same time the safety protection function.

    5.no artificial touch inductive switch or stroke switch.

    6.do not shut down after the shutdown of the gas valve.

    7.prohibit non designated personnel to modify the PLC program and other parameters.

    Home
    主站蜘蛛池模板: 精品成人AV一区二区三区 | 欧美成人片一区二区三区| 亚洲成人网在线观看| 成人午夜免费福利| 欧美成人免费观看的| 美国成人a免费毛片| 成人国产一区二区三区| 国产成人精品久久综合| 成人性开放大片| 国产成人综合日韩精品无码| 国产成人精品男人免费| 国产成人一区二区三区| 欧美日韩在线成人| 成人凹凸短视频在线观看| 四虎成人免费影院网址| 欧美成人午夜视频| 成人免费一区二区三区在线观看| 国产成人高清亚洲一区久久| 久久久成人影院| 在线观看国产成人av片| 亚洲最大成人网色香蕉| 成人爱做日本视频免费| 亚洲国产成人久久精品软件| 欧美成人免费高清视频| 久久国产成人精品国产成人亚洲| 国产成人精品福利色多多| 欧美成人免费一级人片| 亚洲AV无码成人专区| 亚洲欧洲成人精品香蕉网| 国产AV成人一区二区三区| 国产日产成人免费视频在线观看| 欧美成人手机视频| 欧美成人在线影院| 欧美成人一区二区三区在线视频 | 欧美a级成人淫片免费看| 日本成人免费网站| 亚洲av成人一区二区三区在线观看| 国内外成人免费视频| 国产成人精品综合在线观看| 大臿蕉香蕉大视频成人| 国产精品成人无码久久久|